When you need it
Use an NCR when objective inspection or test evidence shows that an item does not meet an identified applicable requirement. Open it while the location, affected quantity and evidence can still be reliably established.
AI tools and documents for engineering and project management.
Record objective nonconformance evidence against an exact requirement and request containment and disposition by the responsible role.
How to use this templateThis Word template contains prepared headings, tables, project fields and completion notes. Add your information, review the completed document and remove the notes before issue.
The form prepares a separate brief; it does not fill the Word or Excel file.
Read product descriptions in your language. The Word and Excel template files are in English.
Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.
Learning
Use an NCR when objective inspection or test evidence shows that an item does not meet an identified applicable requirement. Open it while the location, affected quantity and evidence can still be reliably established.
It separates the observed nonconformance from proposed solutions and authorized disposition. The team can contain affected work, assess consequences and demonstrate that verification supports eventual closure of the specific finding.
The inspector or quality engineer records evidence with the responsible discipline specialist. The contractor proposes disposition where appropriate; acceptance, technical concessions and closure belong to the roles authorized by the project arrangements.
Do not combine the factual finding with an assumed cause or prescribe an unreviewed repair; each needs its own evidence and competent consideration.
Illustrative example: an inspection identifies installed pipe supports at locations inconsistent with the issued drawing. The NCR records measurements, photographs and source references. The responsible engineer evaluates a disposition, and closure awaits evidence that the accepted correction or other authorized resolution has been verified.
Confirm the adopted edition, local amendments, National Annex where relevant, and contract requirements.