Record evidence that the contractor’s organization, resources and work arrangements are ready for the defined start.
How to use this templateThis Word template contains prepared headings, tables, project fields and completion notes. Add your information, review the completed document and remove the notes before issue.
The form prepares a separate brief; it does not fill the Word or Excel file.
Read product descriptions in your language. The Word and Excel template files are in English.
Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.
Learning
Use this review before a contractor begins a defined work package, or after a material change in method, resources, or site conditions makes the previous readiness conclusion unreliable.
It turns scattered competence, resource, method, permit, and access evidence into a bounded readiness decision, allowing unresolved prerequisites to be addressed before they affect the planned work or its controls.
A construction or package manager typically coordinates the review with safety, quality, engineering, and contractor representatives. Competence specialists assess relevant qualifications, while the project's designated authority decides whether the work may start.
Declaring the contractor generally ready after checking paperwork alone can conceal missing task-specific access, competence, equipment, or release conditions at the workface.
Illustrative example: a contractor plans deep excavation for a pump chamber. The review finds that the excavation method and supervision are evidenced, but utility isolation confirmation is missing. The readiness record identifies that condition, and the authorized manager withholds release of the affected excavation.
Confirm the adopted edition, local amendments, National Annex where relevant, and contract requirements.