When you need it
Use when a proposed design or procurement alternative may improve whole-life value while preserving required functions. Prepare before changing the approved baseline or counting an expected saving in project reporting.
AI tools and documents for engineering and project management.
Describe an alternative that preserves required functions and identify its whole-life consequences before approval.
How to use this templateThis Word template contains prepared headings, tables, project fields and completion notes. Add your information, review the completed document and remove the notes before issue.
The form prepares a separate brief; it does not fill the Word or Excel file.
Read product descriptions in your language. The Word and Excel template files are in English.
Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.
Learning
Use when a proposed design or procurement alternative may improve whole-life value while preserving required functions. Prepare before changing the approved baseline or counting an expected saving in project reporting.
The proposal tests whether a cheaper or faster alternative shifts costs or weakens required performance. It supports a transparent change decision with technical validation and implementation consequences visible alongside potential benefits.
The proposing designer, contractor or value engineer prepares it with cost and operational contributors. Relevant discipline reviewers verify retained performance; the authorized owner and contract roles decide consent and implementation.
Reporting the purchase-price reduction as achieved savings before checking installation changes and future maintenance can overstate value and conceal costs transferred to operations.
Illustrative example: a contractor proposes changing an equipment-room cladding system to reduce purchase cost. The proposal records required durability and access functions, maintenance differences and affected details. The owner reviews the net value and outstanding technical checks before deciding whether to authorize the design change.
Confirm the adopted edition, local amendments, National Annex where relevant, and contract requirements.
Prepare project brief