Catalogue preview. Sales, template downloads and AI generation are not open yet.
PMC Pilot
XLSX /

AI tools and documents for engineering and project management.

Unit Rate Build-up Worksheet

Document the resources, productivity basis and cost inclusions behind a proposed unit rate.

You receive an editable Excel workbook with prepared working sheets and completion notes on a separate sheet. Enter your project data in the form and review the completed workbook before use.

Excel files are editable forms and registers. They do not calculate or validate engineering or financial results.

Prepare project brief

The form prepares a separate brief; it does not fill the Word or Excel file.

Document titles, contents and files are in English.

Conceptual engineering models and drawings

Document contents

  • Document control and decision owner
  • Evidence, scope and applicability
  • Rate boundary
  • Resource and productivity basis
  • Cost normalization
  • Rate verification
  • Open points, competent review and decision

Required inputs

  • Project / asset identity, assessment date, scope and authorized decision owner
  • Verified source documents with exact revision and record locators
  • Defined measured item and unit
  • Dated material, labor and plant cost sources
  • Sourced productivity and working-condition assumptions
  • Tax, overhead and margin treatment

Practical tools.
Professional judgment.

Confirm the adopted edition, local amendments, National Annex where relevant, and contract requirements.

Prepare project brief