Installed System Configuration Baseline Register

Record the verified installed configuration and its controlled change references for a defined system baseline.

How to use this template

This Excel template contains prepared working sheets and completion notes on a separate sheet. Enter your project data and review the completed workbook before use.

The form prepares a separate brief; it does not fill the Word or Excel file.

Read product descriptions in your language. The Word and Excel template files are in English.

Selected page preview · XLSX

Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.

Learning

How to use this template

When you need it

Use this baseline when the project needs a controlled record of approved and installed equipment, software, or system configuration, particularly before testing, handover, modification, or investigation of a configuration discrepancy.

What it helps you decide

It makes the relationship between approved configuration and installed evidence explicit, allowing reviewers to identify unauthorized differences and assess later changes without relying on memory, obsolete drawings, or unverified equipment lists.

How to complete it

  1. Populate Item / tag ID, System / function, Item type, and Model / version from the actual system inventory and controlled technical records.
  2. Reference Approved configuration reference and Installed configuration evidence separately, then record Baseline date and Change reference so the status of each item is traceable.
  3. Set Verification status based on completed comparison and describe Open discrepancy precisely, referring unresolved differences to the authorized technical or change decision process.

Who prepares and reviews it

A configuration or systems engineer usually coordinates discipline leads, commissioning staff, suppliers, and operations contributors. The designated technical authority controls baseline decisions, while competent reviewers verify installed evidence and resolve discrepancies through the project change process.

A mistake to avoid

Overwriting the approved configuration with the installed value hides the discrepancy and removes the evidence needed to decide whether a change was authorized.

Illustrative example

Illustrative example: a building-management controller arrives with a firmware version different from the approved configuration. The baseline records both the approved reference and installed evidence under the controller tag. The technical authority assesses compatibility and records the required change decision before final system acceptance.

Explore the wider topic

Document contents

  • Item / tag ID
  • System / function
  • Item type
  • Model / version
  • Approved configuration reference
  • Installed configuration evidence
  • Baseline date
  • Change reference
  • Verification status
  • Open discrepancy

Required inputs

  • Project name, location, company, document number and revision
  • Actual project scope, source records and responsible roles

Practical tools.
Professional judgment.

Confirm the adopted edition, local amendments, National Annex where relevant, and contract requirements.

Prepare project brief