When you need it
Use this handover when topographical or geodetic datasets move from a survey provider to a designer, contractor, or asset owner and their reference systems, completeness, and intended use require confirmation.
AI tools and documents for engineering and project management.
Transfer survey datasets with their reference systems, revisions, coverage and stated limitations.
How to use this templateThis Word template contains prepared headings, tables, project fields and completion notes. Add your information, review the completed document and remove the notes before issue.
The form prepares a separate brief; it does not fill the Word or Excel file.
Read product descriptions in your language. The Word and Excel template files are in English.
Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.
Learning
Use this handover when topographical or geodetic datasets move from a survey provider to a designer, contractor, or asset owner and their reference systems, completeness, and intended use require confirmation.
It prevents technically readable survey files from being mistaken for verified design or setting-out inputs, by preserving datum information, dataset identity, accuracy statements, and unresolved receiving-party checks for intended use.
The survey provider typically compiles the handover, with the receiving surveyor and design coordinator checking usability. A competent geospatial reviewer assesses reference-system questions; acceptance authority depends on the appointment and project process.
Importing survey files successfully into CAD does not confirm their datum, accuracy, completeness, or suitability for design levels and construction setting out.
Illustrative example: a road designer receives a terrain model and control schedule for a junction upgrade. The handover records the supplied horizontal system but identifies missing vertical-datum confirmation. The files are received, while drainage-level design waits for the surveyor's clarification and a checked benchmark reference.
Confirm the adopted edition, local amendments, National Annex where relevant, and contract requirements.
Prepare project brief