Catalogue preview. Sales, template downloads and AI generation are not open yet.
PMC Pilot
XLSX /

AI tools and documents for engineering and project management.

Schedule and Recovery Toolkit

Plan activities, compare baseline and current dates, display a Gantt chart and track recovery actions.

You receive an editable Excel workbook with prepared working sheets and completion notes on a separate sheet. Enter your project data in the form and review the completed workbook before use.

Prepare project brief

Includes date and variance formulas, a Gantt chart and recovery tracking for 60 activities. It does not calculate a critical path or resource leveling. Read Instructions before use.

The form prepares a separate brief; it does not fill the Word or Excel file.

Document titles, contents and files are in English.

Conceptual engineering models and drawings

Document contents

  • Activity ID
  • WBS
  • Baseline dates
  • Current dates
  • Progress
  • Recovery actions

Required inputs

  • Project name, location, company, document number and revision
  • Actual project scope, source records and responsible roles

Practical tools.
Professional judgment.

Confirm the adopted edition, local amendments, National Annex where relevant, and contract requirements.

Prepare project brief