This Word template contains prepared headings, tables, project fields and completion notes. Add your information, review the completed document and remove the notes before issue.
The form prepares a separate brief; it does not fill the Word or Excel file.
Read product descriptions in your language. The Word and Excel template files are in English.
Selected page preview · DOCX
Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.
Learning
How to use this template
When you need it
Define these criteria before teams assign risk ratings, or when inconsistent interpretation of likelihood and impact makes existing ratings unreliable for comparing threats, opportunities, escalation needs, and management priorities.
What it helps you decide
They give assessors a shared language for uncertainty and consequences, allowing ratings to reflect project objectives and decision thresholds rather than individual intuition or unexplained colour choices in a register.
How to complete it
State Purpose and application, then define Probability scale in terms that fit the project context and the evidence assessors can reasonably use.
Develop Impact scale by objective and Combined and exceptional impacts, distinguishing different consequences without hiding a severe specialist issue inside a combined rating.
Agree Rating and escalation rules and Approval and revision basis, ensuring the criteria are controlled and applied consistently when project circumstances materially change.
Who prepares and reviews it
A risk specialist usually develops the criteria with project controls, technical, commercial, safety, and sponsor input. The project's authorized governance body approves their application, while specialists review objective-specific impacts and exceptional cases.
A mistake to avoid
Using numeric labels without defined consequence descriptions invites inconsistent scoring and makes apparently precise ratings unsuitable for comparing risks across different work packages.
Illustrative example
Illustrative example: infrastructure teams previously labelled both a short drawing delay and a major access loss as high risk. The criteria define project-specific likelihood and impact descriptions, then identify escalation rules. Reassessment reveals which event needs sponsor intervention and which remains within normal package management.