Catalogue preview. Sales, template downloads and AI generation are not open yet.
PMC Pilot
DOCX /

AI tools and documents for engineering and project management.

Request for Information (RFI)

$12 USDUser licenses: 1
$24 USDUser licenses: 5

One-time purchase

Ask one source-contextualised technical question and route the answer to the authorized responsible party.

How to use this template

This Word template contains prepared headings, tables, project fields and completion notes. Add your information, review the completed document and remove the notes before issue.

Prepare project brief

The form prepares a separate brief; it does not fill the Word or Excel file.

Read product descriptions in your language. The Word and Excel template files are in English.

Selected page preview · DOCX

Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.

Learning

How to use this template

When you need it

Raise an RFI when a specific ambiguity, conflict or missing technical detail prevents confident execution or design coordination. Prepare it after checking the current sources and attempting resolution within the project's normal coordination arrangements.

What it helps you decide

It frames one answerable question with sufficient context and evidence. The responsible party can resolve the technical uncertainty while the team separately considers any resulting instruction, scope or commercial implications.

How to complete it

  1. Identify the location and current drawings or specifications, then summarize the conflicting requirements and relevant source references without reproducing unnecessary protected material.
  2. State one clear question, describe attempted resolution and potential effects, and explain the requested response timing using actual work dependencies and project rules.
  3. Route the question to the authorized reviewer, retain the response, and check whether a separate change instruction or revised document is needed before closing it.

Who prepares and reviews it

The engineer encountering the gap usually drafts the RFI with affected discipline input. The designated designer or technical reviewer responds; any resulting change instruction requires the actual contractual or project authorization route.

A mistake to avoid

Do not bury multiple unrelated questions in one RFI or treat its response automatically as authorization for additional work or payment.

Illustrative example

Illustrative example: an equipment layout and a structural detail show different opening sizes. The RFI identifies both revisions and asks which coordinated opening requirement applies. The designer's response then informs whether a revised drawing and separate change assessment are necessary before fabrication proceeds.

Explore the wider topic

Document contents

  • Document control
  • Single clear question
  • Project context and location
  • Relevant documents and revisions
  • Conflict, ambiguity or missing information
  • Attempted resolution
  • Potential impact and response deadline
  • Authorized reviewer response
  • Change instruction interface
  • Issue and closure route
  • Project records
  • Preparation, review and approval

Required inputs

  • Project name, location, scope and responsible organization
  • Project jurisdiction and confirmed regulatory applicability
  • Contract document hierarchy and conflict resolution route
  • Source titles, exact revisions and relevant sections
  • RFI information
  • Applicable drawings and their approved revisions
  • Applicable specification sections and editions
  • Photo evidence

Practical tools.
Professional judgment.

Confirm the adopted edition, local amendments, National Annex where relevant, and contract requirements.

Prepare project brief