How to use this template
When you need it
Raise an RFI when a specific ambiguity, conflict or missing technical detail prevents confident execution or design coordination. Prepare it after checking the current sources and attempting resolution within the project's normal coordination arrangements.
What it helps you decide
It frames one answerable question with sufficient context and evidence. The responsible party can resolve the technical uncertainty while the team separately considers any resulting instruction, scope or commercial implications.
How to complete it
Identify the location and current drawings or specifications, then summarize the conflicting requirements and relevant source references without reproducing unnecessary protected material.
State one clear question, describe attempted resolution and potential effects, and explain the requested response timing using actual work dependencies and project rules.
Route the question to the authorized reviewer, retain the response, and check whether a separate change instruction or revised document is needed before closing it.
Who prepares and reviews it
The engineer encountering the gap usually drafts the RFI with affected discipline input. The designated designer or technical reviewer responds; any resulting change instruction requires the actual contractual or project authorization route.
A mistake to avoid
Do not bury multiple unrelated questions in one RFI or treat its response automatically as authorization for additional work or payment.
Illustrative example
Illustrative example: an equipment layout and a structural detail show different opening sizes. The RFI identifies both revisions and asks which coordinated opening requirement applies. The designer's response then informs whether a revised drawing and separate change assessment are necessary before fabrication proceeds.