When you need it
Raise this request when a proposed adjustment to project outputs or controlled baselines needs an explicit decision, whether the source is a client preference, technical finding, interface issue, or emerging constraint.
AI tools and documents for engineering and project management.
Submit a proposed project change with its impacts and an explicit decision request.
How to use this templateThis Word template contains prepared headings, tables, project fields and completion notes. Add your information, review the completed document and remove the notes before issue.
The form prepares a separate brief; it does not fill the Word or Excel file.
Read product descriptions in your language. The Word and Excel template files are in English.
Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.
Learning
Raise this request when a proposed adjustment to project outputs or controlled baselines needs an explicit decision, whether the source is a client preference, technical finding, interface issue, or emerging constraint.
It puts the reason, affected references, impacts, alternatives, and implementation conditions in one decision record, helping reviewers approve an informed change instead of reacting to an isolated drawing or verbal request.
The originator or package lead typically prepares the request with engineering, controls, cost, commercial, and delivery contributors. The designated change authority decides within its remit, with separate contractual approvals obtained where the project requires them.
Marking a request approved before its conditions and affected baseline references are clear can send different teams into incompatible versions of the same change.
Illustrative example: a warehouse operator requests a larger loading canopy. The request identifies drawings, drainage interfaces, structural consequences, and a schedule concern, then compares a smaller alternative. The change authority approves the alternative with conditions, and implementation verification checks the revised documents against that decision.
Confirm the adopted edition, local amendments, National Annex where relevant, and contract requirements.