Define and reconcile the technical requirements and evidence on both sides of a specific system interface.
How to use this templateThis Word template contains prepared headings, tables, project fields and completion notes. Add your information, review the completed document and remove the notes before issue.
The form prepares a separate brief; it does not fill the Word or Excel file.
Read product descriptions in your language. The Word and Excel template files are in English.
Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.
Learning
Use when two systems, packages or organizations must agree a specific physical or functional boundary. Prepare during coordination and revisit after changes affect geometry, loads, utilities, controls or operating dependencies.
The record places both sides of an interface in one traceable technical discussion. It exposes mismatched assumptions and verification gaps before installation or testing depends on an agreement that has not actually been reached.
The interface coordinator prepares it with responsible engineers from both sides and relevant operations contributors. Competent discipline reviewers check evidence; authorized representatives agree the configuration, while energization or operation requires its separate authority.
Closing an interface because drawings align geometrically can miss functional requirements or shared-service dependencies that become visible only during coordinated verification of both systems.
Illustrative example: a packaged cooling unit connects to building pipework, power and controls supplied by different contractors. The record compares each boundary requirement and identifies an unresolved control response. Both engineering teams agree the required resolution and verification before the project makes a separate operational release decision.
Confirm the adopted edition, local amendments, National Annex where relevant, and contract requirements.