This Word template contains prepared headings, tables, project fields and completion notes. Add your information, review the completed document and remove the notes before issue.
The form prepares a separate brief; it does not fill the Word or Excel file.
Read product descriptions in your language. The Word and Excel template files are in English.
Selected page preview · DOCX
Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.
Learning
How to use this template
When you need it
Use this review when a controlled drawing or design package is formally submitted for assessment. Confirm its purpose and review scope first, particularly when earlier comments, related disciplines or interface drawings affect the package's interpretation.
What it helps you decide
It links observations to the exact submission and applicable design basis. The originator receives clear response requirements, while the project retains evidence of what was reviewed and the resulting authorized disposition.
How to complete it
Identify the submitted package and transmittal, checking drawing revisions against the review scope, applicable design basis, interface drawings and any relevant prior review comments.
Record observations by sheet or detail with their requirement sources, then state the response needed without extending the review into unsupported approval of unexamined matters.
Review responses or revised information as required, record the designated reviewer's disposition and retain the project record defining the submission's actual reviewed scope and status.
Who prepares and reviews it
The assigned discipline reviewer examines the package with interface specialists as needed. The design coordinator controls comments and routing; review codes and their contractual effects depend on the actual project arrangements.
A mistake to avoid
Do not assume a review stamp transfers design responsibility or approves every aspect of the package; interpretation depends on the actual review scope and contract.
Illustrative example
Illustrative example: a structural submittal includes a revised penetration detail but unchanged services drawings. The review records the interface inconsistency and requested response. The coordinator obtains aligned information before the responsible reviewer determines the package's disposition for its intended issue purpose.