Design Review Plan

Define review stages, disciplines, interfaces, inputs, checkers, gates and deliverables.

How to use this template

This Word template contains prepared headings, tables, project fields and completion notes. Add your information, review the completed document and remove the notes before issue.

The form prepares a separate brief; it does not fill the Word or Excel file.

Read product descriptions in your language. The Word and Excel template files are in English.

Selected page preview · DOCX

Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.

Learning

How to use this template

When you need it

Develop the review plan before major design submissions so reviewers, inputs and interfaces can be organized around meaningful stages. Update it when design scope, competence needs or contractual review obligations change during delivery.

What it helps you decide

It makes review purposeful rather than a late document circulation exercise. The team can obtain the right specialist input at the right stage and define evidence needed to demonstrate completion of each review.

How to complete it

  1. Define review objectives using design scope, deliverable milestones and contractual obligations, identifying competence requirements and the disciplines or interfaces each review stage must address.
  2. For each stage, list deliverables, review focus, reviewer role and required inputs, choosing methods proportionate to the decisions that the design stage must support.
  3. Set completion evidence and comment-resolution expectations, reconcile reviewer availability with milestones and route the plan through the project's agreed technical review and approval arrangements.

Who prepares and reviews it

The design manager prepares the plan with discipline leads, independent checkers and relevant construction or operations representatives. Review authority and competence requirements follow the actual project scope, contract and organizational delegations.

A mistake to avoid

Do not invite reviewers without defining their remit and required inputs; broad circulation can create many comments while leaving critical interfaces unexamined.

Illustrative example

Illustrative example: a plant design needs early maintenance-access review before layout freeze. The plan brings operations and lifting specialists into that stage with the necessary drawings. Their findings can then influence the layout before detailed design makes modifications more disruptive.

Explore the wider topic

Document contents

  • Review objectives
  • Review stages
  • Review method
  • Completion basis
  • Project records
  • Preparation, review and approval

Required inputs

  • Design scope and deliverable schedule
  • Review responsibilities and competence requirements
  • Project criteria and contract review obligations

Practical tools.
Professional judgment.

Confirm the adopted edition, local amendments, National Annex where relevant, and contract requirements.

Prepare project brief