This Word template contains prepared headings, tables, project fields and completion notes. Add your information, review the completed document and remove the notes before issue.
The form prepares a separate brief; it does not fill the Word or Excel file.
Read product descriptions in your language. The Word and Excel template files are in English.
Selected page preview · DOCX
Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.
Learning
How to use this template
When you need it
Prepare the design basis memorandum when design objectives, operating requirements and site information need to become a common technical foundation. Update it when verified inputs or authorized requirements alter assumptions across disciplines.
What it helps you decide
It gives designers an explicit basis for consistent choices and exposes unresolved inputs. Reviewers can determine whether a proposed solution follows the same operating, site and scope assumptions as the rest of the project.
How to complete it
Define design boundaries and operating objectives, then gather survey, investigation and applicable contractual or jurisdictional requirements with their confirmed revisions and limits of use.
Record design parameters, values or requirements, units and sources, naming verification owners and keeping unresolved assumptions visible alongside the approach adopted for current design development.
Review cross-discipline consistency and unresolved basis items, document the effect of new evidence and route material changes through the competent design review and approval process.
Who prepares and reviews it
The design manager coordinates discipline leads, process or operations representatives and investigation specialists. Competent technical reviewers assess adopted approaches; approval of the design basis follows actual contractual and project delegations.
A mistake to avoid
Do not allow provisional operating assumptions to become invisible design commitments; identify their owners, evidence needs and consequences for affected disciplines before finalization.
Illustrative example
Illustrative example: a warehouse design begins before final storage heights are confirmed. The memorandum records the adopted operational basis and the unverified parameter affecting several disciplines. The employer's confirmation later allows designers to assess changes coherently before freezing layouts and engineering calculations.