When you need it
Use during feasibility or expansion planning when forecast demand must be compared with available service capacity. Update after material changes in customer commitments, operating hours, demand profiles or reliability assumptions.
AI tools and documents for engineering and project management.
Blank worksheet for recording demand scenarios, capacity assumptions and gaps calculated in a separately reviewed model. Includes completion guidance; no formulas.
How to use this templateThis Excel template contains prepared working sheets and completion notes on a separate sheet. Enter your project data and review the completed workbook before use.
This editable workbook helps you organise project information. Check any included formulas, assumptions and results before use; it does not replace professional review.
The form prepares a separate brief; it does not fill the Word or Excel file.
Read product descriptions in your language. The Word and Excel template files are in English.
Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.
Learning
Use during feasibility or expansion planning when forecast demand must be compared with available service capacity. Update after material changes in customer commitments, operating hours, demand profiles or reliability assumptions.
The worksheet exposes the demand and capacity basis behind an expansion decision. It helps distinguish average utilization from peak constraints and supports staged responses without pretending forecasts are confirmed future demand.
A planning or process engineer prepares the assessment with operations and demand-data owners. A competent model reviewer checks calculations separately; the sponsor or asset owner decides on investigations and investment timing.
Adding customer commitments to a forecast that already includes those customers double counts demand and can create a misleading case for premature expansion.
Illustrative example: a water-service operator considers a new pump because summer peaks approach the existing system's evidenced capability. The worksheet separates peak observations from annual averages and records reviewed scenario outputs. The owner then decides whether monitoring, operational changes or staged expansion warrants the next study.
Confirm the adopted edition, local amendments, National Annex where relevant, and contract requirements.
Prepare project brief