Catalogue preview. Sales, template downloads and AI generation are not open yet.
PMC Pilot
XLSX /

AI tools and documents for engineering and project management.

Delay Event Chronology and Evidence Log

Assemble contemporaneous event facts and records for subsequent schedule and contractual analysis.

You receive an editable Excel workbook with prepared working sheets and completion notes on a separate sheet. Enter your project data in the form and review the completed workbook before use.

Excel files are editable forms and registers. They do not calculate or validate engineering or financial results.

Prepare project brief

The form prepares a separate brief; it does not fill the Word or Excel file.

Document titles, contents and files are in English.

Conceptual engineering models and drawings

Document contents

  • Document control and decision owner
  • Evidence, scope and applicability
  • Event boundaries
  • Chronology compilation
  • Activity and interface links
  • Gaps and competing accounts
  • Open points, competent review and decision

Required inputs

  • Project / asset identity, assessment date, scope and authorized decision owner
  • Verified source documents with exact revision and record locators
  • Site diaries and dated correspondence
  • Relevant schedules and progress updates
  • Instructions, access and resource records
  • Evidence of mitigation and competing events

Practical tools.
Professional judgment.

Confirm the adopted edition, local amendments, National Annex where relevant, and contract requirements.

Prepare project brief