Capital Expenditure Cost Plan

$12 USDUser licenses: 1
$24 USDUser licenses: 5

One-time purchase

Organize investment cost by defined scope, timing and evidence maturity with a clear funding boundary.

How to use this template

This Excel template contains prepared working sheets and completion notes on a separate sheet. Enter your project data and review the completed workbook before use.

This editable workbook helps you organise project information. Check any included formulas, assumptions and results before use; it does not replace professional review.

Prepare project brief

The form prepares a separate brief; it does not fill the Word or Excel file.

Read product descriptions in your language. The Word and Excel template files are in English.

Selected page preview · XLSX

Only selected pages are shown. This is not the complete template. The full editable Word or Excel file is supplied with purchase.

Learning

How to use this template

When you need it

Use when a project needs a structured investment estimate or budget review. Maintain it as scope, evidence maturity and package timing develop from feasibility through procurement and construction planning.

What it helps you decide

The cost plan clarifies the full investment boundary and the evidence behind each package. It distinguishes a working estimate from an approved budget and exposes excluded owner costs or poorly defined scope.

How to complete it

  1. Map Cost packages and Scope boundaries to a nonoverlapping breakdown. Include applicable enabling and owner costs while keeping acquisition and operating items distinctly identified.
  2. Record Evidence / maturity and Base cost using quantities, quotations or labelled assumptions. Separate Allowance types for scope, uncertainty, escalation and taxes.
  3. Reconcile Timing, Excluded cost and Budget status to the stated investment boundary. Explain differences between the current estimate, approved baseline and actual spending authority.

Who prepares and reviews it

The cost manager prepares it with designers, procurement, planners and owner-side contributors. A reviewer checks completeness and basis; finance and the authorized sponsor determine funding and budget approval separately from estimate preparation.

A mistake to avoid

Using a broad contingency to conceal known missing scope makes the estimate difficult to challenge and can leave essential packages outside the approved funding discussion.

Illustrative example

Illustrative example: a warehouse estimate includes the building works but initially omits the off-site power connection and owner commissioning support. The cost plan assigns those items distinct packages and evidence states. The sponsor reviews the complete investment boundary before deciding whether the proposed funding request is sufficient.

Explore the wider topic

Document contents

  • Document control and decision owner
  • Evidence, scope and applicability
  • Cost structure
  • Estimate maturity
  • Allowance treatment
  • Total reconciliation
  • Open points, competent review and decision

Required inputs

  • Project / asset identity, assessment date, scope and authorized decision owner
  • Verified source documents with exact revision and record locators
  • Approved project scope and breakdown structure
  • Quantity and rate evidence
  • Estimate basis and price date
  • Owner costs, contingencies and funding inclusions